In the scenario that a technician is working multiple days on a single Work Order there are parameters that you should take into account. 

## \uD83D\uDCD8 Instructions

Start with answering the following questions regarding this topic:

1. Does a technician needs to sign-off their work per day? If the technician requires a customers signature per day then for each day a Work Order is required.
2. How long does a Work Order take?
  1. a few days or a week? In this scenario, just extend the duration of the work order in the FieldBuddy Dispatch Panel and make it extend multiple days. The Work Order will show up on each day in the mobile application.
  2. multiple weeks? In this scenario the work order could exceed the scope of the mobile application and will then not appear on the device of the technician. Please split up the work into multiple Work Orders.
3. Does the technician work on multiple days on the job, but not those days are not adjacent to each other. For example. The technician works on Work Order #123 on Monday, Tuesday and on Friday. In this scenario you can only have the Work Order to start on Monday and end on Friday. There’s no support <u>yet</u> for multiple appointments on a single Work Order.
4. How does the user track time?
  1. Depending on the current time configuration there’s multiple scenario’s available. Using the stopwatch (manually), using the stopwatch between status changes or no stopwatch at all and just entering the data manually. In the case of Work Orders running multiple days, having the stopwatch disconnected from the status could work. Depending on how often these type of Work Orders take place. Creating an additional status, like “Pause” or “On Hold” could also be an option.  This additional status could stop the timer when switching from Active to On hold.

Depending on the answered questions, different solutions are possible. To sum up the solutions:

1. Have for each day a work order
2. Extend the duration of the work order over multiple days (take briefcase scope into account)
3. Adjust time-tracking configuration

Having the Work Order split up gives the planner a better overview on the progress of the job. 

> ⚠️ Make sure volumes of data (amount of checklists, parts etc.) do not increase too high with Work Orders that cross multiple days.